Clark Bridge patterns to return to normal

Posted: 2013/06/12 in congestion, MoDOT

Finally there is some good news today: starting at 09:00 tomorrow MoDOT will revert Highway 67 in St. Charles County back to its normal traffic pattern.  The bad news is that this will require a full closure of the southbound lanes from Route 143 to Route 94  for at least 2 hours and there is one more morning peak period to deal with the heavier than normal traffic (which has been backing up all the way to 255 during the 0700 hour).  In addition, new dates of the river bridge inspection should be announced in the coming days.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s