Rescheduled river bridge inspections announced

Posted: 2013/07/01 in construction, IDOT

Earlier this afternoon, IDOT announced the new dates of the river bridge inspections.  The original dates of the inspection had to be changed due to the flooding that impacted the River Bend region last month and caused heavier than normal traffic patterns to happen for a 10 day period.

The tentative schedule, weather permitting, is listed below:

  • July 8 and 9:  Westbound right lane closed 09:00 to 15:00
  • July 10 and 11: Eastbound right lane closed 07:30 to 15:00

Please slow down during the work zones.  Nobody wants to see an repeat of the incidents that happened during the canal bridge inspections that drew media attention on 4 of the 5 days that one week.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s