EB Canal Bridge closures 1/26 -UPDATE CANCELLED

Posted: 2015/01/23 in construction
Tags:

On January 26, weather permitting, one eastbound lane on 270 from just west of the canal bridge to Route 3 will be closed from 08:00 to 14:00, as crews from Walsh Construction will begin prepping what was once the old westbound canal bridge for demolition.  That demolition is tentatively scheduled for February 4.  UPDATE: Lane closure scheduled for 1/26 has been CANCELLED and will be rescheduled for another date.

Eastbound drivers can expect delays going all the way back towards Lilac.  Drivers in both directions can expect the 45 MPH construction zone speed limit to be enforced.  Please consider going through Alton to get around it, as the last lane closure that was back in December caused a 7 mile long traffic jam that went all the way back to 367.

EDITED at 01:12 on 1/24/15 reflecting the lane closures has been cancelled.  Sorry for the delay in getting this page updated – currently work the 15:30-00:00 shift right now.  KH

Advertisements
Comments
  1. […] EB Canal Bridge closures 1/26 -UPDATE CANCELLED […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s