Weekend work scheduled July 15-17

Posted: 2016/07/08 in construction, IDOT
Tags: , , ,
IMG_1550

The orange cones are coming back next weekend.  Be prepared.

As hinted on the construction VMS on 255 at 270 and on 270 at New Halls Ferry and at 255, there will be weekend work on the river bridge, weather permitting, on the weekend of July 16 and 17.  Only one lane in each direction will be open to traffic, opening the possibilities of delays stretching back to 255 for westbound traffic and 367 for eastbound traffic.  Do not be surprised to hear about delays going over one hour.

This work is required to seal the bridge decks.

Lane restrictions will begin late in the night of July 15 around midnight, and will not be lifted until 21:00 on July 17.

Please consider taking alternate routes, and keep in mind that MoDOT is doing work on the Poplar Street Bridge and there is lane closures on Route 143 between Route 3 and the Clark Bridge.

Advertisements
Comments
  1. El Jefe says:

    This is ridiculous we are hungry have 2 potty n stuck on this damn bridge trying 2 get aquaport

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s