WB 270 lane closures at river bridge 8/9 and 8/14-17

Posted: 2017/08/08 in construction, IDOT
Tags:

IDOT has announced off-peak lane closures for westbound 270 at the river bridge on various dates in the next week from 09:00 to 15:00, weather permitting.

The patches that had failed or about to fail.

The bottom line is to expect delays starting at the canal bridge and a reduced speed limit that will be enforced by the ISP.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s